• info@ciet-turkmenistan.com
  • +99312 41 40 08
  • +99364 94 53 85
  • ENG RUS TKM
    • About the Conference
      • About the Conference
      • Download portal
      • Agenda
      • FAQ
      • Speakers
    • News
      • News
      • sign-up-for-newsdigest
  • ENG RUS TKM

    News & Updates
    LIFE SAVING

    Goodsoul partners with lafarge on national literacy competition

    Education

    Goodsoul improves education infrastructure

    Newsletter Subscription

    • Home
    • All News

    More than 870 million kilowatt-hours of electricity were generated at the power plant in Avaza.

    03 Oct 25

    The State Power Plant "Avaza," located in the national tourist zone, has been providing uninterrupted electricity for several years not only to the Balkan velayat (region) but also to other regions of the country, reports the newspaper "Turkmenistan."

    Power engineers of Turkmenbashi worked with high efficiency during the reporting period of 2025. Since the beginning of the year, they have generated 870 million 506 thousand kilowatt-hours of electricity.

    This figure exceeded the plan by 20 million 506 thousand kilowatt-hours and amounted to 102% of the target. Thus, the growth rate of electricity production at the enterprise reached 110%.

    The station was solemnly commissioned in 2010. It is equipped with two gas turbines with a total capacity of 254.2 megawatts. Of particular importance is the possibility of their operation on diesel fuel if necessary, which ensures the effective functioning of the station.

    In addition to the gas turbine power unit, 15 small substations operate at the power plant. The facilities are equipped with electrical equipment utilizing technologies that comply with world standards.

    Sectors

    • Industry and Construction
    • Diversification of Energy resources
    • Modern trends in architecture
    • Industry
    • Public-private partnership

    Quick links

    • Official support
    • Sign up for news digest
    • List of participants

    Contact

    • Phone: +993 12 41 40 08
      +993 64 94 53 85
    • Email: info@ciet-turkmenistan.com
    This website is property of The Ministry of Construction and Architecture of Turkmenistan ©2026. All rights reserved, Ashgabat, Turkmenistan.